Control4 Programming Phases
(353 total words in this text) (179 reads) 
· Order products - At this stage, prewire is complete, painting of the walls is next. Cable terminations (cable connectors) and wall plates will be completed after painting. Equipment is ordered, lead times upon receipt vary from 1 day to 4 weeks.
· Preliminary Lab Setup - Preliminary setup and programming of main products. Research is done to download or learn IR commands into IR database. Preliminary setup is complete and system is tested.
· Lab debug session - Debug main system components, touchpanels, and remote controls. Terminations, cables, and products are tested and re-tested.
· Trim Cables - Installation and trim cables for A/V rack and OnQ © low voltage panel. Installation of products throughout the home.
· Home Initial Setup - Installation of all products including customer owned products (TV's, CD players, cable boxes etc.). Additional research is done for customer owned products to download or learn IR commands into IR database.
· Home Initial Program - Revisions to programming allows integration of all subsystems. Includes Main controller, A/V system (program customer owned products), Lighting system, HVAC system, Network, etc. System test is performed.
· Home Debug session - Debug whole system including network, A/V, lighing kepads, touchpanels, remote controls, thermostats, etc. Terminations, cables, and products are tested and re-tested.

Television On Screen Display (OSD) Touchpanel (OSD)
· Programming - Graphical User Interface - Music / MP3. (Customer owned) Compact discs are loaded & copied into MP3 player and coverart is downloaded.

Television On Screen Display (OSD) Touchpanel (OSD)
· Programming - Graphical User Interface - Videos / DVD Changer. (Customer owned) DVD's are loaded into DVD changer and coverart is downloaded.
· Programming revisions - Finalize programming after client uses system.
|

|